Open Milwaukee pack-out drawers beside the Atlas Zeus graphic on the van

Project

Tewantin Home Renovation

Full electrical renovation in Tewantin — sub-board upgrade, lighting and power throughout, plus air conditioning, so the renovated home works safely and day to day.

Sunshine Coast · Enquire

The challenge

Issue

The home needed a complete electrical refresh to support the renovation and modernise the property. The existing electrical setup was outdated, lighting was limited, and the client wanted a cleaner, more functional layout with improved safety and better overall presentation.

What we did

We completed a full electrical fit-out across the home, including a sub-board upgrade, new lighting, power points, new split system air conditioning and updated wiring throughout the renovated spaces. Feature lighting and modern fittings were installed to complement the new interior design, while exterior lighting improved visibility and street appeal around the home.

Outcome

Results

The renovation now has a modern, safe, and practical electrical setup that suits the updated layout of the home. Improved lighting, upgraded power access, and a new sub-board have made the property more functional, energy efficient, and visually polished both inside and out.

On-site gallery

Original kitchen and dining layout before renovation, featuring outdated cabinetry, tiled flooring, and exposed electrical rough-in work during construction.

The renovation process underway — stripping the space back and preparing for a full electrical and interior transformation across the kitchen, dining, and living areas.

Warm LED strip lighting installed beneath a kitchen island bench, paired with woven pendant lights and timber flooring in a renovated Tewantin home.

Subtle LED strip lighting added beneath the kitchen island to create a warm ambient glow and elevate the overall feel of the renovated living space.

Modern double power point installed neatly against tiled kitchen splashback with concealed LED strip lighting above.

Clean finishes and practical design details throughout the kitchen renovation, including neatly installed power points and concealed LED lighting.

Woven rattan pendant lights hung above a timber kitchen island in the renovated Tewantin home.

Feature pendant lighting over the island — chosen to suit the renovated kitchen and give the main living space a clear focus.

LED strip lighting washing light across a tiled kitchen splashback during the Tewantin renovation fit-off.

Strip lighting used to wash the splashback — ambient light that supports the feature tiling without relying only on downlights.

Ceiling downlights spaced with existing skylights to provide even task lighting in the renovated living area.

Downlights set to work with the skylights — even task lighting across the room without fighting the daylight openings.

Project details

Services included

Power
Ceiling Fans
Lighting
Renovations
Smoke Alarms
Split System Air Conditioning

Technical specifications

Sub-board Upgrade - New modern sub-board installed - RCD and circuit breaker protection added - Clearly labelled circuits for easier use and maintenance - Improved safety and capacity for future upgrades Kitchen, Living & Dining - New LED lighting installed throughout the main living areas - Additional double power points added for improved functionality - Feature lighting installed to complement the renovated finishes - Updated switching, cabling, and electrical layout throughout Bathrooms - New lighting and exhaust fans installed - Heated towel rail fitted for added comfort and functionality - Modern fittings paired with compliant bathroom wiring upgrades Laundry - New power points and dedicated appliance circuits installed - Updated lighting and switching throughout the space - Electrical wiring adjusted to suit the new laundry layout Garage - New lighting and power setup completed - Additional GPOs installed for practical day-to-day use - Improved visibility and functionality throughout the garage area Exterior Lighting - New outdoor wall lighting installed around the home - Lighting added to pathways and entry points for better access - Improved security and night-time visibility across exterior areas

Questions about this project

Straight answers — useful for search and context.

Why did this renovation need a sub-board upgrade?

The renovated layout needed more circuits, clearer protection, and room for what was being added — including air conditioning and updated lighting. A modern sub-board with RCD protection and labelled circuits made the new work safer to use and easier to look after later.

How long did the electrical work take?

About two weeks on site, coordinated around the wider renovation. That covered the sub-board, lighting and power through the main rooms, bathrooms, laundry, garage, exterior lighting, and the split-system air conditioning electrical scope.

What changed for day-to-day use of the home?

Lighting suits how the rooms are used, power points land where they are needed, and the board is clearer to understand. Exterior lighting improved access and visibility around the home. The electrical work is part of the renovation finish — not an afterthought.

Was this a homeowner-led job?

Yes. Jake and Sara engaged Atlas directly for the residential renovation electrical scope. The work was planned around how they use the home, with the electrical package fitting the wider renovation.

Ben stepping into the Atlas van at the open cab door

Talk through something similar

Send plans, photos, or a plain note about what is going on. Enquire starts the conversation.