Gallery job
New sub-main into the house, a new sub-board, and conduit feeds for the pool equipment, circuit and lighting.

Direct homeowner. They asked for a pool circuit. Max demand on the existing feeds was severely undersized for the cabling already in — that was the dimming when the ducted air cycled on. The pool feeds are a separate package from the sub-main. More renovation work is coming over the next 6–12 months.
Dug a new sub-main to the house, upgraded the garage sub-board to a flush-mount board with labelled circuits, and laid conduit feeds for the pool equipment, circuit and lighting.
This stage is in — sub-main, sub-board, and pool conduit feeds. The property stays an ongoing renovation.
Sub-board

Existing sub-board — no spare capacity, dated protection, and a faulty RCD.

New flush-mount board going in.

New sub-board, labelled.
Sub-main

Trench work behind the lime.

New sub-main run to the house.

New feed in the ground.

Entry at the house.

House end of the new feed.
Pool equipment, circuit and lighting

Conduit feeds for the pool equipment, circuit and lighting.

Pool feeds stubbed up.